Project: | Foundation, ELS Support—Hong Kong Airlines Aviation Training Centre—Kwo Lo Wan Road, Chek Lap Kok, Hong Kong
赤鱲角過路灣道航空飛航訓練中心地基基礎、土地挖掘及側向承托工程 |
Construction Period: | 12/2015 – 07/2017 | |
Foundation Type: | Raft Footing, Excavation, Pipe Piles, ELS and Drainage Diversion
筏板基礎、土地挖掘、鋼管樁及渠道改道 |
Project: | Foundation Works for Residential Development at Fuk Wing Street, Sham Shui Po (NKIL6538)
九龍深水埗福榮街地基基礎工程住宅發展項目 |
![]() |
Construction Period: | 12/2015 – 12/2016 | |
Foundation Type: | Large Diameter Bored Pile, Pipe Pile, Excavation Lateral Support & Pile Cap 大型鑽孔樁、樁帽及鋼管樁、挖掘及側向承托 |
![]() |
Project: | Foundation Subcontract Works of Department Quarters for Immigration Department at 20 Heng Lam Street, Lok Fu, Kowloon 九龍樂富杏林街20號入境處政府宿舍分判地基工程 |
Construction Period: | 01/2016 – 10/2016 | |
Foundation Type: | Pre-bored Socketed H Pile 套入岩石鋼樁 |
Project: | Foundation, Excavation & Lateral Support, Basement and Ground Floor Structure Works for Proposed Residential Development at Nos. 8-12 Deep Water Bay Drive, Rural Building Lot No. 1190 香港深水灣徑8-12號地基、土地挖掘及側向承托、地底結構住宅發展項目工程 |
![]() |
Construction Period: | 08/2013 – 05/2016 | |
Foundation Type: | Large Diameter Bored Piles, Pre-bored Socket Steel H-piles and Soldier Piles/Pipe Piles 大型鑽孔樁、套入岩石鋼樁、鋼管樁 |
![]() |
Project: | Foundation, Basement Excavation & Lateral Support, Pile Cap and Hoarding Works for the Proposed Residential Development at NKIL 6527, Kai Tak Area 1I, Area 3, Kowloon 九龍啟德第二區3號地基、挖掘及側向承托、樁帽工程住宅發展項目 |
Construction Period: | 02/2015 – 04/2016 | |
Foundation Type: | Driven Steel H-piles 工字鋼樁 |
Project: | Foundation Works for HY/2013/01 Hong Kong – Zhuhai – Macao Bridge, Hong Kong Boundary Crossing Facilities, Clearance Building 香港 - 珠海 - 澳門大橋香港口岸通關大樓地基項目 |
![]() |
Construction Period: | 12/2014 – 03/2016 | |
Foundation Type: | Pre-bored Socketed Steel H-piles 預鑽套入岩石鋼樁 |
![]() |
Project: | Site Formation, Foundation and Pile Cap Works at Sai Kung, Hong Tsuen Road, N. T. 新界西貢康村路土地平整、地基樁帽工程住宅發展項目 |
Construction Period: | 11/2014 – 01/2016 | |
Foundation Type: | Pre-bored Socketed Steel H-piles and Driven Steel H-piles 預鑽套入岩石鋼樁 + 工字鋼樁 |
Project: | Proposed Development at No.19, 21-23 Dai Shing Street, Tai Po, N.T. 新界大埔大盛街19, 21-23號廠房發展項目 |
![]() |
Construction Period: | 12/2014 – 06/2015 | |
Foundation Type: | Driven Steel H-piles 工字鋼樁 |
![]() |
Project: | Foundation, Excavation and Lateral Support and Pile Cap Works at 92-98 High Street, Hong Kong 香港高街92-98號地基、土地挖掘及側向承托、樁帽工程住宅發展項目 |
Construction Period: | 06/2013 – 10/2014 | |
Foundation Type: | Pre-bored Socketed Steel H-piles 預鑽套入岩石鋼樁 |
Project: | The Construction of Piled Foundation
and Caps for Public Library and Indoor Services Recreation Centre in Area 3, Yuen Long 新界元朗公共圖書館地基工程 |
![]() |
Construction Period: | 07/2010 - 02/2014 | |
Foundation Type: | Raft Foundation 筏形基礎 |
![]() |
Project: | Foundations, Excavation and Lateral Supports (ELS) for the Proposed Residential Redevelopment At No.11 Grampian Road, Kln 九龍嘉林邊道11號設計及建造地基住宅發展項目 |
Construction Period: | 11/2012 – 02/2014 | |
Foundation Type: | Pre-bored Socketed Steel H-piles and Soldier Piles 套入岩石鋼樁 |
Project: | Design and Build for Piling Works and Pile Cap/ELS Design at
No. 197-203 Castle Peak Road, Cheung Sha Wan, Kowloon 九龍長沙灣青山道197-203號設計和建造的地基工程 |
![]() |
Construction Period: | 10/2012 – 09/2013 | |
Foundation Type: | Large Diameter Bored Piles 大型鑽孔樁 |
![]() |
Project: | Kai Tak Government Office Building 九龍啟德政府辦公室大樓打樁工程 |
Construction Period: | 03/2012 – 09/2012 | |
Foundation Type: | Driven Steel H-piles 錘擊工字鋼樁 |
Project: | SCL, New International Mail Centre, Kowloon Bay 九龍灣沙田至中環線,新國際郵件中心項目 |
![]() |
Construction Period: | 09/2011 – 12/2011 | |
Foundation Type: | Driven Steel H-piles 錘擊工字鋼樁 |
![]() |
Project: | Foundation Works for Proposed Hotel Development at Nos. 123, 125 & 127 Tung Choi Street, Mongkok, Kowloon 九龍旺角通菜街123, 125 及127號酒店發展項目 |
Construction Period: | 03/2010 – 12/2010 | |
Foundation Type: | Large Diameter Bored Piles 大型鑽孔樁 |
Project: | Piling Works for Proposed IB Wing Development at 131 Argyle Street, Mongkok, Kowloon for Diocesan Boys' School 九龍旺角亞皆老街131號拔萃男書院打樁工程 |
![]() |
Construction Period: | 10/2009 – 01/2010 | |
Foundation Type: | Mini-piles on slope 徵型樁 (建於斜坡上) |
![]() |
Project: | The Construction of Government Complex at Mei Lai Road, Mei Foo, Lai Chi Kok 九龍荔枝角美荔道政府總部大樓工程 |
Construction Period: | 11/2007 – 03/2008 | |
Foundation Type: | Pre-bored Socketed Steel H-piles 套入岩石鋼樁 |
Project: | 10-year Extended Landslip Preventive Measyres Project, Phase 6, Package B, Landslip Preventive Works for Slopes in Hong Kong Island, Sai Wan Estate 香港西灣邨第六期B斜坡防止山泥傾瀉計劃工程 |
![]() |
Construction Period: | 03/2006 – 12/2007 | |
Foundation Type: | Hand Dug Caissons 手挖沉箱 |
![]() |
Project: | Foundation for the Construction of a Second Primary School at Site 10, Hoi Lai Estate, Sham Shui Po 九龍深水埗海麗邨第二小學地基建造工程 |
Construction Period: | 03/2007 – 09/2007 | |
Foundation Type: | Jacked Steel H-piles 鑽入工字鋼樁 |
Project: | Foundation for The Construction of a Primary School and a Secondary School at Site10, West Kowloon Reclamation Sham Shui Po, Kowloon 西九龍填海區深水埗小學及中學地基建造工程 |
![]() |
Construction Period: | 01/2005 – 09/2005 | |
Foundation Type: | Driven Steel H-piles 錘擊工字鋼樁 |